Town of Chase Building Permit Fees
Effective November 29, 2000

A.  Commercial Building and Additions:

     0 - 2500............................................................... $100.00
     2500 & Up........................................................... $_____  (.10 per square foot )

     1)  Commercial Remodeling and Tenant Alterations:

          $75.00 Minimum Plus $5.00 per $1000.00 of Valuation
B.  Residence / Additions / All Other Buildings and Structures:

     Valuation:  $  1,000.00 to $  5,000.00...............$120.00
                        $  5,000.00 to $40,000.00.............. $120.00 plus $5.00 per thousand
                        $40,000.00 and up.......................... $315.00 plus $1.00 per thousand
C.  Accessory Buildings:

      Up to 600 square feet........................................ $35.00
      Over 600 square feet......................................... $____  (.10 per square foot )
D.  Agricultural Buildings......................................... $35.00
E.  Heating and Air Conditioning

      Residential.......................................................... $35.00
      Commercial........................................................ $50.00 plus $.02 per square foot
F.  Electric:

      Residential.......................................................... $35.00
      Commercial........................................................ $50.00 plus $.02 per square foot
G.  Plumbing:

      Residential.......................................................... $35.00
      Commercial........................................................ $50.00 plus $4.00 per fixture

H.  Electric Service Charge:

      R-1 Single Family............................................... $35.00
      R-2 Commercial................................................. $50.00

  I.  Erosion Control................................................... $35.00
J.   Wrecking or Razing / Abandonment................ $35.00
K.  Communication Towers.................................... $500.00
L.   Decks:

          0 - 150 square feet........................................ $35.00
      150 - 600 square feet....... ............................... $45.00
      Over 600 square feet................. ...................... $____  (.10 per square foot )

M.  Other Fees:

Upon failure to obtain a permit before work on a building has been started, expect in emergency cases, the total fees shall be double the fees charged.  On the second offense, total fee shall be tripled; third offence - fees shall be quadrupled.  Any other occasions may, in addition, bring about citations.

      Re-inspections................................................... $  50.00

      Street cleaning................................................... $ _____ ( Actual Cost )

      Occupancy without permit................................. $100.00 per day

          *Note 1 - A permit shall be in effect for a 24 month period.  Work that is not shown on the
            plans is not included in the permit.

          *Note 2 - An additional fee for plan review may be assessed at the time of application for
            renewal of permit.

          *Note 3 - Farm buildings are exempt from inspections.

     Building permits for one-family and two-family new homes, effective 11/29/2000, consists of
     all permits for structure, HVAC, plumbing, electric, erosion, energy, and eleven inspections.

            0 - 1499 square feet.................................... $415.00
     1500 - 1999 square feet.................................... $430.00
     2000 - 3000 square feet.................................... $450.00
     Over    3000 square feet.................................... $500.00

     Park fee............................................................... $650.00

     State building stamp........................................... $  25.00

A $1,000 construction deposit fee may be assessed for construction over $5,000.00.